fmc park road
Green River, WY
FMC Park is a popular 638-acre community park with recreational areas, scenic views, and access to the Greenbelt Pathway located in Green River, Wyoming. FMC Park Road serves the park and two new subdivisions. IME performed services in the construction of a new street, storm sewer, water lines, and sanitary sewer for the City of Green River. The street was constructed on FMC Park Road from East Teton Boulevard east to within 500 feet of the bridge on the Green River. The sanitary sewer design included a lift station and force main to connect to the existing gravity sewer on East Teton Boulevard. The improvements were sized to serve the new subdivisions on the north and south side of the road. This project was amended to include establishing invert elevations at 36 manholes along a route from FMC Park Road to the wastewater treatment plant. These elevations were needed for the hydraulic analysis of the sewer, which IME provided as part of our original scope of services.
Inberg-Miller Performed the following service on this project:
- Survey and Base Sheets
- Topographic Survey
- Boundary Survey for the preparation
- Sanitary Sewer Design, including lift station and force main
- Subsurface Exploration
- Geotechnical Report
- Waterline Design
- Storm Sewer Design
- Street Design
- Specifications
- Bidding Document
- Cost Estimate
- Bidding Phase Services